|
|
BUILDING HEIGHT | |||
|
The height of your building affects the logistics of installation, the design wind loading, and possibly the length of the conduit run. For taller buildings, a crane must usually be employed to get the modules and mounting hardware to the roof-top. Wind loading design parameters also increase with building height. Finally, the installation cost must take in to account the distance from the array to the grid tie-in point. |